previous
  • Roofing articles, videos, tools, and materials
    Roofing articles, videos, tools, and materials
  • 7 Small Bathroom Layouts
    7 Small Bathroom Layouts
  • Tool Test Preview: Compact Compressors
    Tool Test Preview: Compact Compressors
  • Buyer's Guide to Insulation
    Buyer's Guide to Insulation
  • Your Guide to Energy Smart Homes
    Your Guide to Energy Smart Homes
  • How to Avoid Complicated Fractions
    How to Avoid Complicated Fractions
  • Top 10 Videos of 2011
    Top 10 Videos of 2011
  • An Introduction to Thermal Imaging
    An Introduction to Thermal Imaging
  • 7 Solutions for Kitchen Layout and Design
    7 Solutions for Kitchen Layout and Design
  • Fine Homebuilding: The Digital Issues
    Fine Homebuilding: The Digital Issues
  • The Inspector Game: Goofs on a Roof
    The Inspector Game: Goofs on a Roof
  • Replacing a Roof : Installing a Ridge Vent
    Replacing a Roof : Installing a Ridge Vent
  • Larry Haun: One Carpenter's Life (1931-2011)
    Larry Haun: One Carpenter's Life (1931-2011)
  • 10 Basement-Remodeling Tips and Techniques
    10 Basement-Remodeling Tips and Techniques
  • See the Latest 2013 Houses Awards Entries
    See the Latest 2013 Houses Awards Entries
next


Craftsman Room Addition phase 8

comments (0) December 11th, 2008 in Project Gallery        
Huck Huck, member
3 users recommend

Hanging board in preparation for stucco.  The walls will get two-coat stucco over foam, and the lid will be synthetic stucco over DensGlass Gold exterior sheathing.
These two guys are brothers, and they do exacting work.  Almost seems a shame to cover it up!
Hardi-plank siding.  Destroyed my 10 sawblade on my sliding compound miter saw, but I got it finished before I had to buy a new blade!
I know, I know, I should get shears, but I dont use this stuff that often.  Next time....
Paint!  Hard to believe, but this is the same color as the doors behind it - so it should weather to match. 
If you open that green door and look at the back edge of the door that never sees sun or dust, you can tell that the color is correct.
R-19 fiberglass batt insulation.  I wanted to put up a blanket and blow the insulation into the walls, but no one in town carried it.  My supplier said they could get it - with a $500 special order shipping fee attached!  Yeah, right.
Drywall is up, were closing in on it.  I hired a helper for a few hours to get the lids up, but other than that, I did the whole thing myself.  Almost wore me out...but I cant stop now!
Hanging board in preparation for stucco.  The walls will get two-coat stucco over foam, and the lid will be synthetic stucco over DensGlass Gold exterior sheathing.
These two guys are brothers, and they do exacting work.  Almost seems a shame to cover it up!Click To Enlarge

Hanging board in preparation for stucco.  The walls will get two-coat stucco over foam, and the lid will be synthetic stucco over DensGlass Gold exterior sheathing.

These two guys are brothers, and they do exacting work.  Almost seems a shame to cover it up!


I hired out the stucco, did the siding, insulation, and sheetrock myself.  Keepin' on keepin' on, I would probably be done by Christmas, if I didn't have to replace a Pella door (The new one is on order) because the owner doesn't like the high threshold.

This is not my design, I am the general contractor.


Design or Plan used: My own design - HP Construction
posted in: Project Gallery, insulation, water and moisture control, , additions, bathroom, paint, bedroom, bungalow

Comments (0)

You must be logged in to post comments. Click here to login.