previous
  • Energy-Smart Details
    Energy-Smart Details
  • Video: Install a Fence
    Video: Install a Fence
  • Read FHB on Your iPad
    Read FHB on Your iPad
  • 9 Concrete Countertops Ideas
    9 Concrete Countertops Ideas
  • Design Inspiration
    Design Inspiration
  • Basement Remodeling Tips
    Basement Remodeling Tips
  • Radiant Heat Comparison
    Radiant Heat Comparison
  • Magazine Departments
    Magazine Departments
  • 7 Smart Kitchen Solutions
    7 Smart Kitchen Solutions
  • Remodeling Articles
    Remodeling Articles
  • Master Carpenter Videos
    Master Carpenter Videos
  • All about Roofing
    All about Roofing
  • 7 Trim Carpentry Secrets
    7 Trim Carpentry Secrets
  • Tips & Techniques for Painting
    Tips & Techniques for Painting
  • Ultimate Deck Build 2015
    Ultimate Deck Build 2015
  • Clever daily tip in your inbox
    Clever daily tip in your inbox
  • Video Series: Tile a Bathroom
    Video Series: Tile a Bathroom
  • 7 Small Bathroom Layouts
    7 Small Bathroom Layouts
next
Pin It

Fast, Accurate Floor Sheathing

Working together, a four-person crew finishes a subfloor in an hour

North Carolina builder Danny Kelly has figured out a way to install a subfloor on an average-size house in about an hour. With a four-person crew, two carpenters move and cut panels, and two place and nail the sheets to the joists. This article provides step-by-step instructions for both teams, as well as a list of dos and don'ts to follow. A key time-saving technique that Kelly's crews follow is letting panels overhang the band joist until all of them are in place. They can then be cut flush with the band joist. Likewise, Kelly recommends cutting in place odd-sized panels such as the ones around a crawlspace opening. A sidebar by Massachusetts builder Brian McCarthy explains how to install a new subfloor in an old house that's out of square.

Fast, Accurate Floor Sheathing
Plus get a free gift
Become a Fine Homebuilding Member. Start your free trial now