previous
  • Wanted: Plumber for a Bathroom Remodel
    Wanted: Plumber for a Bathroom Remodel
  • 7 Small Bathroom Layouts
    7 Small Bathroom Layouts
  • How To Make a Reciprocating-Saw Blade Guide Block
    How To Make a Reciprocating-Saw Blade Guide Block
  • The Self-Taught MBA: Inspired Reading
    The Self-Taught MBA: Inspired Reading
  • Seven Steps to Choosing the Perfect Circular Saw
    Seven Steps to Choosing the Perfect Circular Saw
  • How to Figure Out Concrete Volume with Sketchup
    How to Figure Out Concrete Volume with Sketchup
  • Top 10 Videos of 2011
    Top 10 Videos of 2011
  • VIDEO: Stop Paint from Bleeding
    VIDEO: Stop Paint from Bleeding
  • How to Avoid Complicated Fractions
    How to Avoid Complicated Fractions
  • Replacing a Roof : Installing a Ridge Vent
    Replacing a Roof : Installing a Ridge Vent
  • Fine Homebuilding: The Digital Issues
    Fine Homebuilding: The Digital Issues
  • 10 Basement-Remodeling Tips and Techniques
    10 Basement-Remodeling Tips and Techniques
  • Your Guide to Energy Smart Homes
    Your Guide to Energy Smart Homes
  • The Inspector Game: Goofs on a Roof
    The Inspector Game: Goofs on a Roof
  • Patrick's Barn: A Perfect Place for a Party
    Patrick's Barn: A Perfect Place for a Party
next

Flooring raised to new heights

Leftover flooring strips on the ceiling can make for a warm, comfortable atmosphere in your bathroom

Which way is up? Leftover bamboo flooring installed on the ceiling adds warmth to this small bathroom and prevents design overload. Which way is up? Leftover bamboo flooring installed on the ceiling adds warmth to this small bathroom and prevents design overload.

We wanted our bathroom to be interesting, but not overwhelming. The walls are a muted blue, and the bathtub surround and the flooring are black slate. To add warmth, the vanity and the ceiling are bamboo. Instead of ordering extra bamboo plywood, though, we decided to use the prefinished, carbonized vertical bamboo-flooring strips left over from our living room.

First, we installed 3/4-in. plywood subflooring over the drywall on the bathroom ceiling. Along the length of the room, we started on one side fastening the planks with a finish nailer and worked our way to the end. We fussed for a little while cutting pieces to fit around the light fixture, the vent, and the exhaust fan while still leaving 3/4 in. for expansion due to humidity changes.

Other than that, the process was surprisingly easy. We are pleased with the end result, and the bamboo has held up perfectly well against the heat and steam from the shower. If I were to tackle this project again, though, I’d make sure to book an appointment with a massage therapist to take care of my neck and arms.

Photo by: Jennifer Pruitt
From Fine Homebuilding191 (Kitchens & Baths) , pp. 26 October 5, 2007