previous
  • The Self-Taught MBA: Inspired Reading
    The Self-Taught MBA: Inspired Reading
  • How To Make a Reciprocating-Saw Blade Guide Block
    How To Make a Reciprocating-Saw Blade Guide Block
  • Top 10 Videos of 2011
    Top 10 Videos of 2011
  • Seven Steps to Choosing the Perfect Circular Saw
    Seven Steps to Choosing the Perfect Circular Saw
  • Replacing a Roof : Installing a Ridge Vent
    Replacing a Roof : Installing a Ridge Vent
  • The Inspector Game: Goofs on a Roof
    The Inspector Game: Goofs on a Roof
  • Patrick's Barn: A Perfect Place for a Party
    Patrick's Barn: A Perfect Place for a Party
  • How to Avoid Complicated Fractions
    How to Avoid Complicated Fractions
  • 10 Basement-Remodeling Tips and Techniques
    10 Basement-Remodeling Tips and Techniques
  • Fine Homebuilding: The Digital Issues
    Fine Homebuilding: The Digital Issues
  • How to Figure Out Concrete Volume with Sketchup
    How to Figure Out Concrete Volume with Sketchup
  • Your Guide to Energy Smart Homes
    Your Guide to Energy Smart Homes
  • VIDEO: Stop Paint from Bleeding
    VIDEO: Stop Paint from Bleeding
  • 7 Small Bathroom Layouts
    7 Small Bathroom Layouts
  • Wanted: Plumber for a Bathroom Remodel
    Wanted: Plumber for a Bathroom Remodel
next

Adding on to a stone foundation

Q: My old house has a dry-laid stone foundation that forms a lumpy A-shape in section and is anything but uniform. Inertia keeps the old foundation in place, and gravity and tradition are what keep the house on top of it. I’d like to build an addition on a concrete foundation. What’s the best way to join the two foundations, and how do I create openings in the old foundation to extend ductwork and other utilities from one part to the next?


Steve Culpepper, Woodbury, CT


A: Rick Arnold, a contributing editor to Fine Homebuilding and a concrete contractor in North Kingstown, Rhode Island, replies: I once knew a guy who poured an addition foundation against a dry-stacked stone foundation. A stone had loosened on the inside of the old foundation, and a whole yard of concrete oozed through before he discovered the problem.

Leaks notwithstanding, joining a concrete foundation to an old stone foundation such as yours can be tricky but not impossible. First, I assume that you want a crawlspace  foundation to support your addition. Have your excavator dig 5-ft. to 6-ft. wide trenches up to the two points where the addition foundation will meet the stone foundation. Hire an excavator with a lot of  experience: He should have a good feel for soil conditions, and he’ll know just how far the machine can go before he has to break out the shovel and finish the dig by hand.

If the depth of the addition foundation is lower than the existing foundation, step back the excavation so that you don’t undermine the old foundation. Be sure to divert down-spouts and all other sources of rainwater runoff safely away from the excavation. Also, coordinate the activities of the foundation contractor and concrete supplier to keep the excavation open as short a time as possible.

To tie the new foundation to the old, form the new walls so that the concrete flows into and integrates with the irregular profile of the old foundation. When the concrete sets, it will be keyed into the nooks and crannies of the stones. To form the section  where the two foundations meet, I make panels of 3/4-in. plywood or oriented strand board. The panels are straight and plumb on one edge where they attach to the nearest form, and I scribe the other edge to match the existing foundation. The scribe doesn’t have to be perfect; 1/2-in. gaps are acceptable.

To join the free ends of the scribed form panels, I usually use jump rods or hook rods. But I’ve also used metal banding along the scribed ends to tie the panels together. Starting at the bottom, I put a rod or a band every foot or so up the panel. By the way, the rebar dowels that tie new work to an old block or a poured foundation are pretty useless in this situation. But I encourage you to brace the stone foundation temporarily from the inside before pouring the concrete.

I usually order the concrete at a 4 or 5 slump, which allows the concrete to flow readily in and around the stone to key the new work to the old. If the concrete starts oozing out, it is probably not stiff enough.

As far as running utilities through the wall, wait until the new foundation has been backfilled and the earth has settled before making holes in the old foundation. It’s better to open a couple of smaller holes spaced as far apart as possible than one large one. Houses old enough to have stone foundations usually have sills made of large timbers, which should span an 18-in. hole easily. Still, I’d avoid making a hole beneath a point load. If the holes need to be bigger or if you’re not sure about the point loads, definitely consult an engineer.

Because of the irregular shape of the stones, it probably will be difficult to remove the exact shape you need for the ductwork and the other utilities. After removing the stone, I build a frame to the right size out of pressure-treated wood. Then I fill in around it with stiff mortar.



From Fine Homebuilding 150, pp. 22 November 1, 2002