New Stairs built from temporary construction stairs.
comments (1) March 27th, 2012 in Project GalleryReplacing temperary stair treads with new solid fir stair treads. The treads are made from 2 x 12's and attached with angle brackets and lag bolts.
Design or Plan used: My own design
posted in: Project Gallery, stairs, Golden lab, Open risers, stack wall
-
How to Paint Fiber-Cement Siding
Painter Jim Lacey shares some tips for caulking and painting fiber-cement siding. read more
Post Pics of Your Own Pet
Whether it's a dog, cat, or even a canary, we want to see and hear about your job-site companion!
Upload your photos HERE.
Enter your project
All How-To Topics




















Comments (1)
Posted: 10:58 am on April 9th
You must be logged in to post comments. Log in.