Tips for Specifying, Pouring, and Finishing Concrete
comments (2) February 8th, 2013 in BlogsConcrete has so many different uses (such as floors, foundations, and countertops) and so many admixtures (water reducers, retardants, accelerants, air entrainers, and so on) that the best way to get the mix you need is to specify its use and desired characteristics. That is, when ordering the mix, tell the supplier the quantity you need (in cubic yards), how the concrete will be used (driveway, foundation, patio slab), the loads it will bear, how far it must be pumped, how it will be finished, and other such details.
If you're pouring a slab that will have a smooth finish, you might specify "a 2,500 psi mix, but a true five-sack mix," which will be "creamy" enough to finish with a steel trowel. If you specify a 2,500 psi mix but don't describe the finish, the supplier might use four sacks of cement and a water reducer to attain that strength. However, with less cement in it, the mix would be sandier and more difficult to finish.
Where the concrete will be placed can also affect the mix. For example, concrete for a second-story patio far from the street may require a smaller, 2-in. (inner diameter) hose to pump it, so the supplier may specify smaller aggregate (3⁄8-in. vs. 3⁄4-in.) to facilitate flow. Aggregate size, in turn, affects load-bearing capacity, so a mix with 3⁄8-in. gravel is often bumped up, say, to 3,000 psi. If the patio slab will also be steel troweled, the mix thus becomes "a 3,000 psi, 3⁄8-in. aggregate, true six-sack mix." Well, you get the point: Be specific.
Estimating the amount of concrete in cubic yards is straightforward: The calculation is width x length x depth (in feet) of the area you want to cover. You then divide that result by 27 (as there are 27 cu. ft. in 1 cu. yd.). If you're pouring a slab, the chart above, "Cubic Yards of Concrete in Slabs of Various Thicknesses," calculates the cubic yards you need to order based upon the slab thickness you want.
Most concrete-mixer trucks can hold 9 cu. yd. to 11 cu. yd. So if your pour requires more than one truck, ask the supplier to time deliveries 90 minutes apart so you have enough time to deal with each delivery. Finally, don't shave the estimate too close; far better to have too much concrete than too little.
Poring or Placing Concrete?
Every trade has its jargon. Concrete snobs, for example, insist on using the phrase placing concrete, though concrete coming out of a 3-in. hose looks more like a pour, albeit a sluggish one. Perhaps "placers" want to emphasize that concrete is so weighty that you should place it as close to its final location as possible. Point taken. But to denote the general movement of concrete from truck to forms, pour us a tall one.
This blog is excerpted from Renovation 4th Edition, just published by Taunton Press. R4's 614 pages include thousands of field-tested tips and techniques, 250+ technical illustrations, roughly 1,000 photos selected from the 40,000 I have taken over the years, and lifetimes of experience that builders have shared with me. I hope you find Renovation 4th Edition useful on your next project. -- Mike
© Michael Litchfield 2013
posted in: Blogs, foundations, concrete
-
How to Paint Fiber-Cement Siding
Painter Jim Lacey shares some tips for caulking and painting fiber-cement siding. read more
About the Author
Mike Litchfield was a founding editor of Fine Homebuilding and has been renovating homes or writing about them for more than 30 years.
He was one of the first technical journalists to go to job sites to gather information from tradespeople and his great work, Renovation: A Complete Guide is in its 3rd Edition.
Mike’s tenth book, In-laws, Outlaws and Granny Flats: Turning one house into two homes will be published by Taunton Press in March, 2011. To preview the book and learn more about its contributors, please visit www.cozydigz.com
All How-To Topics
























Comments (2)
Detectable Tape - Usually comes in 1000' rolls and had aluminum backing so that metal detectors can find them. You will trace them up from the street to your house.
Warning Tape - Usually buried 6"-12" Above utility line so when digging you will see the tape before you hit utility lines.
Make sure to use these for future use! It will save you money and headaches in the future. http://signslabelstapesandmore.com/underground-warning-tapes-c-31.html
Posted: 2:32 pm on April 15th
And just so readers don't get the wrong impression, the term "placed" is used by many pros not impart status but to remind themselves and the guys working for them that concrete must not be allowed to drop more than 4' from the edge of the hose or chute to eliminate "aggregate separation" which weakens the final product.
Posted: 1:47 am on February 19th
You must be logged in to post comments. Log in.