I am a greenhorn in the remodeling business. I am trying to bid an attic refinish and could use info on how to keep the roof vented. I am putting in 3 knee walls and a storage area. My boss gave me some info on a full length soffet vent but, he wasn’t sure of the exact venting methods used for the roof. The basic area of the refinish will be 20′ x 10′.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

Making mitered head casings is a breeze with this simple system.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
Your boss sounds right. I would use a soffit vent in conjuntion with ridge vents. You need to put baffles between the rafters before insulating, though, so that the air can convect between the two vents. Also, what size are your rafters? You may need to sister/furr them out to give you room for the baffles + r-30 (or whatever you need in your area).
thank you for the advice and I am proceeding along. I have finished basements but never an attic and was not aware ( and stil am not) of the various ins and outs but I am learning. I have to start somewhere and this forum is a great place to start.
Stally -
I hope someone has made sure that the attic floor will be strong enough to use as occupied space.
I occasionally see sagging ceilings because the ceiling joists aren't big enough to handle the added loads. It can also happen when attics are used for storage. A few boxes of books, grandma's china, a horseshoe or anvil collection can overload the joists in a hurry.
Good point, I will review that angle. The house is three years old and the part of the attic getting refinished is over the garage. The owners are getting a new roof as a result of hail damage and are putting a rigde vent in with the new roof.
Thank you
The area over the garage can be the worst place to add loads to. Joists are usually spanning 18' - 20' and adding even small amounts of weight can put them over their limit.
Is this job permitted? If it is, you may be fine. If it isn't, make sure that you aren't holding the shi!!y end of the stick as far as being responsible for the design.
You say that the house is only three years old so I wonder if the roof is supported by engineered trusses. If it is, run (don't walk) away until you have a design signed off by a structural engineer. Randomly cutting away parts of engineered trusses is a major no-no. - lol
Load bearing issues aside. I say foam the roof and skip the venting aka a hot roof. Codes may vary.