*
Everybody know I work for a engineering testing lab that deals with concrete, soils, and asphalt. We are working on a new LOWE supercenter in town and we at the point of pouring first footers. We waiting on county inspector and he running late like usual. Finally he get there and we go through the nrmal routine. Compaction test, rebar size, tied, cleanness . the usual. We claim that we be pouring daily and we will need inspections twice a day, six days a week for about four week. County claimed that too much work was going on and that he could not make it daily (weekend,yes)County guy remarked that the lab could sign off since a PE designed the footing. HEY THATS ME!!!!
The guy name was James, I knew that name, he was the one that failed me on my porch. “Hey, James wait a minute can we talk” I spent 30 minute with him with my blueprints,everything I did met code, everything fine, I do not even have to call the county on any of my rebar inspection on the house, just framing,electrical. plumbing and HVAC
Replies
*
Everybody know I work for a engineering testing lab that deals with concrete, soils, and asphalt. We are working on a new LOWE supercenter in town and we at the point of pouring first footers. We waiting on county inspector and he running late like usual. Finally he get there and we go through the nrmal routine. Compaction test, rebar size, tied, cleanness . the usual. We claim that we be pouring daily and we will need inspections twice a day, six days a week for about four week. County claimed that too much work was going on and that he could not make it daily (weekend,yes)County guy remarked that the lab could sign off since a PE designed the footing. HEY THATS ME!!!!
The guy name was James, I knew that name, he was the one that failed me on my porch. "Hey, James wait a minute can we talk" I spent 30 minute with him with my blueprints,everything I did met code, everything fine, I do not even have to call the county on any of my rebar inspection on the house, just framing,electrical. plumbing and HVAC