I have been ask by the city to bid on a job. This job is at our waste water treatment plant. Its a Roof the roof is 65ft di. on a 3 1/2 pitch. Its in 14 pie sections. The bottom is 16ft across, the top is 2ft across. The secps. call for 1in x 6in T&G. How would I figure how much wood it would take. Per pie or what?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
A standardized approach, quick-to-install hardware, and a simplified design make building custom casework cost-effective.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
I have been ask by the city to bid on a job. This job is at our waste water treatment plant. Its a Roof the roof is 65ft di. on a 3 1/2 pitch. Its in 14 pie sections. The bottom is 16ft across, the top is 2ft across. The secps. call for 1in x 6in T&G. How would I figure how much wood it would take. Per pie or what?