*
I’m building a one room cabin with a 10-in-12 roof pitch using 14’rafters. The cabin is 20’long with a 4’front overhang to cover an open porch. I intend to have a 16″ gable overhang at the rear. My question is this; Since the 24’section can be easily sheathed with full and half sheets of plywood, can I sheath the rear overhang with ripped 16″ widths of plywood without compromising structural integrity?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Learn how to plan, fabricate, and install a chute to conveniently send your dirty clothes from an upstairs bathroom or hallway to your laundry room below.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
I'm building a one room cabin with a 10-in-12 roof pitch using 14'rafters. The cabin is 20'long with a 4'front overhang to cover an open porch. I intend to have a 16" gable overhang at the rear. My question is this; Since the 24'section can be easily sheathed with full and half sheets of plywood, can I sheath the rear overhang with ripped 16" widths of plywood without compromising structural integrity?