Can someone describe in words how the bottom-courses flareout, commonly seen on well-detailed homes with cedar siding, is done? Do we just spike on some bevel claps as a means of wedging out the base courses? Or is there some more elaborate technique for doing this?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Fine Homebuilding's editorial director has some fun news to share.
Featured Video
Builder’s Advocate: An Interview With ViewrailHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
I rip out a piece with a seven degree bevel about 1-1/4" and tack it on first. The cedars can bend over it.
I've also done it where a bellyband detail suronds the house at the second floor. This is a frieze above the lower shingles with a crown or cornice added to it. The crown piec must be backed up by a shim to hold it out. This larger sized skirt makes it harder to bend the shingles but it can be done.