*
In Texas, slab on grade is the most common foundation. The inspector keeps adding anchor bolts to the frame punch. He says code requires them within 1′ of each corner and 6′ o. c. from there. That’s easy enough to accomplish while pouring a slab but he also says they are required on both sides of a break in the bottom plate. How do I accomplish this without adding them later after the frame? And if this is the case, why do I need to drive concrete nails in the plate elsewhere? Is this a code requirement?
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story

Learn more about the pros and cons of single-room ERVs.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
Fine Homebuilding Magazine
- Home Group
- Antique Trader
- Arts & Crafts Homes
- Bank Note Reporter
- Cabin Life
- Cuisine at Home
- Fine Gardening
- Fine Woodworking
- Green Building Advisor
- Garden Gate
- Horticulture
- Keep Craft Alive
- Log Home Living
- Military Trader/Vehicles
- Numismatic News
- Numismaster
- Old Cars Weekly
- Old House Journal
- Period Homes
- Popular Woodworking
- Script
- ShopNotes
- Sports Collectors Digest
- Threads
- Timber Home Living
- Traditional Building
- Woodsmith
- World Coin News
- Writer's Digest
Replies
*
In Texas, slab on grade is the most common foundation. The inspector keeps adding anchor bolts to the frame punch. He says code requires them within 1' of each corner and 6' o. c. from there. That's easy enough to accomplish while pouring a slab but he also says they are required on both sides of a break in the bottom plate. How do I accomplish this without adding them later after the frame? And if this is the case, why do I need to drive concrete nails in the plate elsewhere? Is this a code requirement?