Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
DeWalt's new 20v cordless framing nailer has improved recovery time over previous models, and it can sink nails to the proper depth consistently.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
I heard somewhere that a skilled craftsman should be able to get the job done in two weeks.
Now define what you think an average kitchen remodel is?
Now define what you think an average kitchen remodel is?
Why? I already know how long the average kitchen renovation takes for the company I've been working for. That doesn't mean that their average job is THE average.-T
I've enlarged a doorway (new header and drywall without breaking coved ceiling), repaired the floor, moved a heat duct, extended a small wall, disconnected plumbing, demolished and removed paneling and cabinets above and below about 50SF of countertops, moved drain pipe, hung new cabinets with crown moulding, installed a ducted microwave, fabrictated and installed solid surface countertops, reconnected sink and faucet, installed dishwasher and laid 300SF of laminate floor in about 80 hours or so.
When I fnish the floor, cabinet base board and reconnect the supply line to the fridge and stop the drip at the faucet, I'll be under a hundred.
Kowboy
Well, let me see. I started renovating my own kitchen about 2 years ago and at the rate I'm going I 'll have it finished just in time to renovate it again. I'd say that's pretty average doing my own kitchens.
roger
DIY or pro? Probably 2-4 weeks for the latter, 2-4 years for the former.
You forgot one. What about the pro doing his own? 2-4 decades sound right?
Once did a complete (albeit small) renovation between Thursday evening and Monday morning - complete with sheetrock repair, new floor and cabinets.
2 weeks to 2 years.
give or take.
Jeff
Buck Construction
Artistry In Carpentry
Pittsburgh Pa
1 month, 3 days, 6 1/2 hours......on average.
J. D. Reynolds
Home Improvements
You got just about the answer I expected. Too many variables in play.
When I did my own, I planned it as carefully as I could. 19 boxes, new window and sliding door. new floor including ripping up the old glued down particle board underlayment. paint, few drywall repairs and three piece crown.
Took me 8 work days working alone. Probably could have cut that down by two but I'm not as sharp as I used to be. And i'm no plumber or electrician either and i did both. lots of double checking.
But i have heard horror stories of modest remodels taking a month or more while they wait on floors and counter tops.
I have thought, and discussed at length with a previous partner, that there is a market in my area for a kitchen remodeling company that controlls all the pieces and parts and delivers a finished product in ten days or less.
How much does a car cost?
Gary W
gwwoodworking.com
start with 3 days of consultation, design and ordering, write contract, then...
same layout - just updating cabinets and counter tops- 2 weeks
new layout, move plumbing, 3 weeks
gut kitchen, rewire, replumb, new cabinets and countertops - 4 weeks
gut, wire, plumb, install w/ new floors - 5 weeks
add for paint, ventilation, lighting, move walls, move windows, crown mouldings, ceramic tile, install appliances
Cost depends upon the design.
Average Cost of a Small Kitchen Remodel.
Highest Cost : $25,000 to $35,000
Lowest cost : $3,000 to $5,000
Homednb Inc is an efficient platform that makes the kitchen remodeling process transparent, low cost & hassle-free with vetted contractors & secured escrow payment.