I think its OK. It definitely should go on underneath the flange. The top strip goes on afterward so moisture cant drip down behind it(the flange). I do that sometimes if it is more expedient. Then run building paper under it later.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Skim-coating with joint compound covers texture, renews old drywall and plaster, and leaves smooth surfaces ready to paint.
Featured Video
SawStop's Portable Tablesaw is Bigger and Better Than BeforeHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
I think its OK. It definitely should go on underneath the flange. The top strip goes on afterward so moisture cant drip down behind it(the flange). I do that sometimes if it is more expedient. Then run building paper under it later.
*
On a recent episode of Home Again, Riley was installing new
construction windows. He only installed strips of house wrap along
the 2 sides and bottom of window even with the inside edge, none at
the top and no calking. Then nailed the flange. Is this the prefered
method or do these guys know what they are doing?
*look up Bobs contractor licence.........opps dont got one...........is that a clue..........sorry I am looking for trouble today. There have been lots of discussions about windows and bob vila, well not in the same scentance I think.............check the archives
*
Link:
http://www.tyvekconstruction.com/products/sys_hw_inst_bf2.htm
This is how the manufacturer says to do it.
Most window manufacturers require bedding the nailing flange in caulk.
If Riley's such a great carpenter, how come he's always bandaged up?
Easy to look good on Take 27.