What would the fastener schedule be to sister a piece of engineered material (lvl) to an existing header using lag bolts? (2X10, 12′ span)
(I initially thought the header was way undersized but it’s a modular house and the rim joist is doubled above the header for lifting the module. Paranoia tells me to add the lvl.)
Thanks in advance!