Thank You for the advise guys. I going to use what I got from the info, And be a babysitter so they will change their habits.It`d seem like I`m allways doing that and it is frustrating.It like they don`t care, all they want is to hurry up and get out there. So thanks for the advise. cooman |
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Listeners write in about haunted pipes and building-science tomes, and they ask questions about roof venting and roof leaks.
Featured Video
How to Install Exterior Window TrimHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
One should really cover all finished horizontal surfaces with at least a single (preferably double) layer of corrugated when construction will be going on. This should generally be done by the surface installer, but the GC and the individual subs should take responsibility to do it if the installer doesn't.
Thank You! Cooman