My HVAC sub installed PVC coated metal duct 6-10″ round under concrete slab in basement. Ground water is seeping in. It’s a zoned system also. One zone had five inches of water in it. Sub says the ductwork was not intended to be water tight. The duct is probably under footing level about 2-4inches Local plumbing and building inspector says they should be water tight. Any comments.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Listeners write in about haunted pipes and building-science tomes, and they ask questions about roof venting and roof leaks.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
My HVAC sub installed PVC coated metal duct 6-10" round under concrete slab in basement. Ground water is seeping in. It's a zoned system also. One zone had five inches of water in it. Sub says the ductwork was not intended to be water tight. The duct is probably under footing level about 2-4inches Local plumbing and building inspector says they should be water tight. Any comments.