Looking for small jacks to lift wall cabinets. I want to put’em on a temporary table made up of 2 saw horses with a 2X10 laid across.
I’ll lift the cabs up, place’em on the jacks, them adjust’em the last few inches before screwing them to the wall.
I’ve been using a floor jack with a wood extension, but that’s kind of dicey when it rocks.
Bottle jacks don’t have enough length, and the adjustment is too slow.
I’m thinking about the 3rd hand or the T-Jack systems.
Any other suggestions?
Thanks
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
The RealTruck AMP Research Bedsteps give you easy access to your truck-bed storage.
Highlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
why not just temporarily attach a level 1x4 to the wall where the bottom of the cabs will go. the 1x4 is attached to the studs, is already level, and you have to pick up the boxes anyway to get them onto the jack.
good luck rg
Ricky,
I do that on unfinished walls, but these walls are already textured and primed. Just looking for a way not to ding up stuff I'd have to repair.
Thanks.
one way I saw a guy install his base cabinets first. Than he put a 2' square piece of plywood on the base cabinet under the wall cabinet he was about to install. On top of that he put a wood box with leg levelers, than on top of that he put the wall cabinet, turned the leg levelers up to where he wanted it, and secured the cabinet.
That box was sized for a typical 30" tall wall cabinet, and to have the cabinet end up at 7'. Doesn't cover all conditions/ designs, maybe he had more boxes.
Me?, I strain my back installing the upper cabinets first, and get help for the 2' deep over-the-reefer cabinet.
I like putting the uppers first..on a ledger...that said...Dad always puts the base's first......then sets his homemade box on top...and uses one or two shims on that if need be.
Gil-lift makes a nice floor model cab life I'd love to get. Runs about $600 (I think)...not bad at all.....rolling base is removable to set it on lowers(I think..again).
They advertise in FHb and JLC every now and then.
Jeff
Buck Construction Pittsburgh,PA
Fine Carpentery.....While U Waite
i saw a box once that was different lengths on 3 sides to accomodate different heights from the base cabs. i presume they were something like 17", 19", 21".
it looked pretty handy, and if a fella had a couple of them, he could use them for scaffolding when taping nine foot+ ceilings, or tool crates, lunch thrones, etc.
btw, do most people here put the cabs together first, or install them one at a time on the wall?
good luck rg
On the cabs,
Depends how many people I am working with, I prefer to hang them all at once, easier to line up and assemble on the ground and faster in my opinion,
working alone doesn't leave many options.View ImageGo Jayhawks..............Next Year and daaa. Blues View Image
try searching:
Cabinet Pro from E-Z Spread N' Lift Industries
Gillift by Telpro
The 3rd hand
Little Hand
All names from a recent article in Tools of the Trade Magazine I read, I can give you specifics from the article if you can't find what your looking on the web.
draw a level line at 54 inches then take two 2 foot scraps of anything screw to the wall below the lower cabinets height even with the level line and bingo
do it every day, works great