I have an unfinished walkout basement. I was reading of the 1 in. EPS with (2) 1/2 in. plywood floor as a breathable barrier floor. Has anyone done this? How do I compensate for a 2 inch rise to the floor at the existing back door? The back wall and center support wall are stud construction. Do I have to add 2×4 to attach the bottom of the sheetrock
Replies
As I understand the Q - you would need to reframe and re-install the door 2" higher. I don't understand the last part of what you say about bottom of sheetrock....
Welcome to the
Taunton University of Knowledge FHB Campus at Breaktime.
where ...
Excellence is its own reward!
OOps - FLASH! I get it - you are wondering at bottom plate on teh walls. I was thinking SR ceiling.
nothing extra needed there