truss, block, truss, block……….

Isamemon | Posted in Construction Techniques on November 26, 2004 08:40am

Just got the newest FHB and it has an artile by Lary Haunn on rolling roof trusses,

Ive noticed in this artile, as well as his books and films, that he installs a rafter or truss, then the block, then the next rafter or truss.

Is this a regional thing, do many of you do it this way ??

we like to roll all the trusses, then go back hang facia boards, then block. This leaves the plate fully open for walking or leaning out to hold up the facia boards

however lke his artile points out , it would stiffen up the trusses  from the start, and we have not done a roof higher then a 8/12 that had a 36’span, maybe in that situation it would help

I would think that if a person was to truss, block, truss, block. after the first one is up, why bother to loose time on marking layout, use the pre-cut blocks to hold you on layout

 not being critical of Haunn, have admired him and had his books since first editions, and learned a lot from him………….just curious

Reply
  • X
  • facebook
  • linkedin
  • pinterest
  • email
  • add to favorites Log in or Sign up to save your favorite articles

Replies

  1. xMikeSmith | Nov 26, 2004 09:05pm | #1

    ise...  larry had a lot of common sense stuff .. but the article was little too basic..

    i noticed he built a catwalk down the middle... i think that had a lot to do with his antiquarian crew  ( hah, hah, hah )

    i also looked and looked ... couldn't find any mention of stringing and blocking his plates to make sure they were straight..

     i got the part about snapping a line on top of the plate.. but no mention of straightening his wall..

     is this fairly common..  i mean.. doesn't everyone stering and block their wall before they set  floor joists or rafters ?

    Mike Smith   Rhode Island : Design / Build / Repair / Restore

    1. Framer | Nov 27, 2004 02:47am | #2

      Mike,I nail 5/4 on all the corners of the top plates and run a mason line around the whole perimeter which takes about 3 minutes and then using a 3-4' piece of 5/4 I push the walls in or out until that 5/4 just touches the line and the walls come out just fine. Those days of sighting 40' walls are over plus my bue eyes are getting a little old.......;-)Joe Carola

    2. Svenny | Nov 27, 2004 05:49am | #9

      Mike,

      I have used Larry's method of snapping the top of the wall forever (well I guess I was shown this method in the late 70's, early 80's). As soon as I learned of a way to avoid strings while setting trusses, I've never gone back. You have to make sure the guy marking the trusses is very careful in making the reference line. It can really mess things up if he is not (personal experience speaking here!)

      Since it was an article on setting trusses, I assume they felt it wasn't necessary to mention straightening the walls first.

      To me, staightening the walls is a step in itself, doesn't matter if you're going up another floor, or setting trusses. Straight, plumb, and level are givens at that point.

      BTW- Do you string all your walls? I have always sighted them unless I have one that is particularly long, or if it is giving me fits for some reason.John Svenson, builder,  remodeler,  NE Ohio

      1. xMikeSmith | Nov 27, 2004 06:35pm | #17

        sven... since it is so basic.. i thought it was a weak point in the article

         

        step one: string and block the walls to dead straight.. then brace them so they don't move

        one of my guys who moved on to bvigger and better things had lunch with me last week..

         he was framing a house with a new lead man.. stand up the walls, brace them.. then set the 2d floor joists..

         my guy wanted to know why they weren't stringing and blocking.. lead man replied.. "didn't have to.. all of the joists  were cut to exactly the same length"...

         needless to say.... nothing fit from the plate line up

         a guy working by himself might want to "sight " his walls... but it doesn't make a lot of sense to me..

        string-block-adjust  & brace.. an SOP tht should be part of the framing bible

         Mike Smith   Rhode Island : Design / Build / Repair / Restore

        1. Svenny | Nov 28, 2004 01:45am | #21

          Sure don't understand why sighting the walls seems wrong to you. Do you need string to check the crown on joists? do you need string to find the straightest plates?

          Course not. You hold them up to your eye, sight them, and even the slightest bow, crook, or twist is apparent.

          Of course, as you raise the walls and nail them off, you have to be sure all the corners and intersections are plumb. I always double check them prior to straightening and bracing.

          On my jobs, I'm the guy who sights the top plates, while my helper adjusts and braces. Takes less than half the time that stringing does, with no compromise. The walls are always dead nuts on.

          If I was working alone I would have to string line. There is no way a guy could sight and adjust at the same time. It requires a partner.

          As far as your framer's bible- I guess your's must be catholic, while mine is protestant.

           John Svenson, builder,  remodeler,  NE Ohio

          1. Isamemon | Nov 28, 2004 03:20am | #25

            you might be one of those whose eyes have not started to go

            I use to be able to site a straight line or wall, no longer

            however, odd enough, after its built and everything is there, then I can see a straight line, strange I know, I guess its haveing lots of reference points and then I can see the one that is out.

    3. User avater
      mike_guertin | Nov 27, 2004 06:40am | #11

      Larry would never pull out a string to line a wall - everything is by-eye. He says that drawing a line with a speed square across a 2x before making a cut is wasting the customer's $.He's straight production. Framing tolerance is 1/2" in production. His stuff is better than that I suspect but not by much.I like Larry a lot - he's a very nice considerate guy. He lived the change from balloon to platform framing. He has a lot of good ideas but disagree with him on a lot of framing techniques.Talking to him 8 years ago about how we Southern NewEnglanders strap our ceilings with 1x3 and he said "what a waste of perfectly good 1x3" - he'd never consider it.Hopefully he'll be coming east for Builders Trade in Feb (3rd and 4th). He'll be doing demos of framing. He will raise some feathers for sure.MG

      1. Framer | Nov 27, 2004 06:49am | #12

        "Talking to him 8 years ago about how we Southern NewEnglanders strap our ceilings with 1x3 and he said "what a waste of perfectly good 1x3" - he'd never consider it."I agree with him on that Mike. Nobody in New Jersey does it. You wont see one new home with Strapping.The only time you see it is on a Remodel or if you fur down a ceiling that's not level some people with fur it down with 5/4x3. I did it when I moved out to Cape Cod back in 1984 and I couldn't believe what they were doing and they couldn't believe that we didn't do it. But we don't do it here and I doubt that we will for a long time. Every time I've mentioned the word strapping no one knows what it means and we never had problems before not strapping.Joe Carola

        1. jimblodgett | Nov 27, 2004 09:35am | #13

          I've always thought strapping is a holdover from the days when lumber wasn't as uniform as it is today, so they strapped to have the opportunity to flatten a ceiling.  Seemed perfectly reasonable when I learned it.  Can't say I see the need for it today, though. 

          1. Framer | Nov 27, 2004 03:31pm | #14

            Jim,When I moved to Cape Cod and told those guys that I never heard of strapping or seen it they really thought that I was crazy. They couldn't believe that we screwed sheetrock to the bottom of the 1-1/2" joists and at the butt joints we only had 3/4" to screw into. I said to them then why don't you strap the walls they're only 1-1/2" wide.I know they say it's easier for the plumbers and electricians and so on but when I here it's better for nailing it doesn't make sense and then I read that guys will strap I-joists that are 2-1/2" to 3-1/2" wide to me that makes no sense.Yes 5/4 x 3 gives you more to screw into but you don't need it. The point I'm trying to make is that there's thousands and thousands of houses built and being built without it and we have no problems. It's just another example of doing things a different way. I wont say that strapping is wrong but the people who strap can't say that the people who don't strap is wrong or the quality is poor because it's simply not true.Joe Carola

          2. dIrishInMe | Nov 27, 2004 03:43pm | #15

            Back to the blocking, what is the purpose of it?  Is it even necessary? Seems to me that it prevents the insulation from fully covering the top of the wall cap plate. Matt

          3. jimblodgett | Nov 27, 2004 07:28pm | #18

            They serve a couple purposes that I know of, Matt.  First, they keep birds from flying up between the trusses, or rafter tails - I've always assumed that's why we call them "birds blocks". We build primarilly with open soffits/exposed tails here in the Pacific Northwet, I think as a stylistic nod to the bungalows that were so popular here in the early 20th century, but certainly also as a labor and materials savings choice, too.

            The other function birds blocks serve is to keep the truss, or rafter, perpendicular to the top plate, thereby preventing "roll", which is how vertical framing members (rafters, joists, beams, headers) fail - they "roll" to horizontal which of course is weaker.  That's also the function of mid span blocking and bridging.

            Yes, insulation is another good question.  We staple cardboard baffles to the bottom of the top chord in every vented birds block bay that extends from the plate line past the height of the insulation.  We then insulate tight against that baffle, allowing air to move freely above the insulation from the plate line to the ridge or roof vents near the ridge.    

          4. dIrishInMe | Nov 28, 2004 01:17am | #20

            Jim & All:

            Thanks for the explanations.  At least I now know why they call them bird blocks, and although we don't do open soffits here in NC we do have to comply with specific requirements to prevent insect intrusion.  Also, I understand the concept of preventing "roll" but we brace our gable end trusses diagonally so I don't see any need for bird blocks.  I live on the edge of hurricane territory, and although we don't have to comply with many high wind codes, I have been exposed to them and know of no requirements for "bird blocks". 

            We also use the cardboard insulation baffles, but they are installed ~1" from the underside of the roof sheathing, and are turned down to to intersect with the outside edge of the wall cap plate.  In the event of raised heel trusses, sometimes the wall sheathing is run up higher than normal (using scraps of sheathing) to "keep the birds out", which supplements the cardboard stops.

            Not meaning to be rude, but I'll file bird blocks away in the same category as "strapping" and floor system blocking; needed in special situations, but otherwise, just a waste of materials and labor. 

            Referencing another thread about "minimalist framing" bird blocks seem like a prime candidate.

            Matt

            Edited 11/27/2004 5:35 pm ET by DIRISHINME

          5. Framer | Nov 28, 2004 01:50am | #22

            "Not meaning to be rude, but I'll file bird blocks away in the same category as "strapping" and floor system blocking; needed in special situations, but otherwise, just a waste of materials and labor". I agree. I can see putting a Bird Block in with an open soffit but to put blocks in-between rafters is a waste of time in my eyes I've never seen it done and for what reason so the rafters don't roll where are they going to roll once the sheathing is on. It's like strapping a waste of time.Joe Carola

          6. Isamemon | Nov 28, 2004 03:27am | #26

            maybe its a code thing in our area

            we and the inspectors call them bird blocks and also call them freeze blocks,

            why freeze , I have no idea

            but we have to install them, because local code around here requires not only that they are there but that roof sheeting is nailed to them, even if a closed soffit

            I guess when it is the storm of the century, the wind will get between the rafters and lift the roof right off into the neighbors yard  (regardless of all the nailing into the trusses and facia)

            killing fido (and the wicked witch)  thus opening up all kind of lawsuits

          7. davidmeiland | Nov 28, 2004 03:44am | #28

            frieze, not freeze... makes it self explanatory

          8. dIrishInMe | Nov 28, 2004 03:51am | #29

            >> why freeze , I have no idea << Freeze (sp?) is just below the intersection of the soffit and the side wall.  The frieze board (I think is actually the way it's spelled) is at the top of the siding and often there is a piece of crown that joins it to the soffit.   In historic architecture, the frieze was often rather ornate.

            >> local code around here requires not only that they are there but that roof sheeting is nailed to them <<  That would seem to interfere with ventilation between the soffit areas and the attic.  What area/state/etc do you live in?  What model code do you all use?  Just curious.  Matt

          9. Isamemon | Nov 28, 2004 07:50pm | #30

            same here, frieze needs to be nailed to sheeting. opr should I say sheeting nailed to them, vents are either cut into the block or round holes. both have screens

            current code books I assume, never bothered to look it up , but its what the inspectors want in two cities

        2. User avater
          mike_guertin | Nov 27, 2004 04:02pm | #16

          Strapping is a very very local thing. I'll bet if you returned to the Cape you'd find fewer people doing it now - it's going the way of the dinosaurs. I wrote an article for FHB 5 years ago on the how's & why's of strapping (still "in the bank" and likely to die there). There are actually a lot of benefits and the costs aren't really that great. (reduced sound transmission, reduced thermal bridging, truss uplift problems eliminated, joist twist and nail pops eliminated, no need to parallel block for parrallel walls, utility running in both directions without drilling, easy remodeling) Then the downsides (firestopping / draftstopping, ungraded lumber in the frame, ceiling electric fixture mounting.....)Of course with 60% of US homes now using I joist floor framing - almost all of the benefits of strapping evaporate.When I first discovered that 99.9% of the US did not strap ceilings - It opened my eyes. It was the first time that I discovered that there's more than one way to frame a house.When you worked on the Cape did you see any benefit to using strapping?MG

          1. Framer | Nov 28, 2004 01:54am | #23

            "When you worked on the Cape did you see any benefit to using strapping?"Not at all. It was nothing but a pain in the A$$. It didn't benefit the framers and I can't see why everyone there thought it was impossible to screw sheetrock to the bottom of a 2x10. So for me it useless.Joe Carola

      2. hasbeen | Nov 28, 2004 03:36am | #27

        Am I hearing correctly that the guy who just brought up saving a few studs per house straps his ceilings?  How do you justify the use of all that extra time and material?

        The only time I've ever strapped a ceiling is for hanging green rock on 12" centers due to its lesser integrity as compared to the 5/8" type X I have usually put on ceilings.Language is my second language.

        1. User avater
          mike_guertin | Nov 29, 2004 03:35am | #32

          That's right - I never said that my primary reason for skippin studs was to save lumber. I do it to make more room for insulation primarily.And strapping ceilings takes no more time than blocking for parallel walls once you develop a system.

    4. blue_eyed_devil | Nov 30, 2004 09:57am | #34

      Mike...no not every one blcks and strings.

      I can teach a rookie...first day on the job, how to sight a 20' wall without a string. Heres how I do it. I go up and look and notice if it needs to be pushed out a 1/16" or pulled in that amount. I send him up. I make him acknowledge the slight crown. I then instantly straighten it with my brace which I attached while he was getting on the ladder. He acknowledges that it's perfectly straight. I go and check and agree.

      From then on, he knows what straight is supposed to look like.

      I then double check him on the next five or six. If he's got the eye, then I never check again..if he don't....then he has to be retrained.

      I've never had one that didn't pass in two trys.

      40' walls? Simple. I start by plumbing the center. Get that perfect, then take a look. A coupla more 1/16" adjustments and the entire 40' wall looks like a l aser. Occasionally, the center has to be tweaked. That is an indication to me that the line was snapped on a windy day and might be 1/8 to 1/4" off. I simply straighten the top by eye and bang out the bottom plumb into the brick space.

      I have watched string and blockers team spend four hours on a floor that I will do in ten minutes with a helper.

      I don't allow anyone to string and block except under extraordinary circumstances.

      One more thing.....usually, when a new guy show up and starts framing...he misunderstands what I mean when I tell him to use ONLY straight top plates. He learns fast when he's up there pulling the junk off. I don't let it pass....you use only good stuff on top...or you pull it off. If I have to tell you to pull it off twice...your on you last leg. I won't tell them three times. The third time..they have to go....

      blueWarning! Be cautious when taking any framing advice from me. Although I have a lifetime of framing experience, all of it is considered bottom of the barrel by Gabe. I am not to be counted amongst the worst of the worst. If you want real framing information...don't listen to me..just ask Gabe!

      1. xMikeSmith | Nov 30, 2004 09:17pm | #36

        hah.. good 4 u, blue..

         however, we will string and block my job.. and it won't take any longer than your sighting..  and it will stay there until the deck is on or the roof sheathing is on..

        your job.. fine..

        my job .. i pay for string and block.. i get what i pay forMike Smith   Rhode Island : Design / Build / Repair / Restore

  2. brownbagg | Nov 27, 2004 03:12am | #3

    use the pre-cut blocks to hold you on layout.

    Because it never works that way. cant hold them tight enough by the time you get to the end you be twoo inches out. i know, it happen to me.

    1. donpapenburg | Nov 27, 2004 03:19am | #5

      I agree , I tried that once . Half way through I was out of whack so I tossed the pre cut blocks went back to reading the tape.

  3. User avater
    SamT | Nov 27, 2004 03:16am | #4

    I guess it could depend on the size of your crew.

    When I did trusses, oh. . . . .lot's of years ago, we used an operator, a rigger, a ridge man, 2 wall men, and a floor man.

    The floor man's job was to start the first toenail in the blocks and hang them for the truss guys.

    The walls were already plumb and aligned and well braced.

    Then it was block, truss; block, truss; block truss all the way. Depending on layout, add a temp brace  on each end and a permanent one at the ridge line every 4 or 6 trusses. Check layout every 16'.

    First block on the gable end sized to put the first truss on layout from the GE eave sheathing edge. Block the plates and 8' from the eave sheathing edge, block the ridge and bottom chord under it.

    The crane never had to wait for the truss crew, always vice versa. Using hammers and nail bags, not air guns.

    Come back after they're rolled and finish nailing off all the braces that were only end nailed, add any other permanent braces and the rest of the blocking. In California, we wanted blocking 4' OC and at all sheathing edges.

    SamT

  4. chriscal | Nov 27, 2004 03:35am | #6

    I lay the bird blocks on the plate line to use as spacing since around here all the truss companys cut them at 22 and 7/16 and over a long ways it causes ploblems. I set the 2 end gables and put a string between them to make sure all the ridges plain in perfect and the wall are always braced and straightened before the trusses go on at all.

    1. FramerT | Nov 27, 2004 04:28am | #7

      Walls are straightened/braced and a pile of 25 1/2in scraps of 5/4 or 2x4 are cut with nails started in each end. They'll be nailed on top each truss [24oc] as they come. One gable set first[farthest from the crane],then a 2x4 nailed on other gable wall cantilevered out the same overhang. No need for crane having to lift over that gable with every truss. If the trusses have 'piggy-backs', they are assembled on ground w/appropriate 2x4s nailed on bottom and lifted in 1 piece by crane.Most of the time anyway. The only 'blocking' we had to do was anytime trusses were over 24oc, like stair openings.
      I DIDN'T DO IT...THE BUCK DOES NOT STOP HERE.

  5. dIrishInMe | Nov 27, 2004 05:22am | #8

    Around here, 85% of the houses are stick framed, except for the tract builders.  That said, I've never seen the bird blocks used, except once by a guy who didn't pronounce his Rs. 

    I agree though with BrownBag.  If you were to do the roll-block-roll-block thing you would get off layout, unless you adjusted the tursses as you went.

    In short - we don't need no stinkin blocks!!!!
       
     

    Matt
  6. jimblodgett | Nov 27, 2004 06:31am | #10

    "...then block. This leaves the plate fully open for walking or leaning out to hold up the facia boards"

    let's see if I can say this clearly - hold the inside bottom edge of your birds blocks so that it just touches the exterior sheathing, then square the birds block so that it's square with the truss, not plumb.  That leaves not only the entire top plate free to walk on but you gain the thickness of the sheathing and hey, you'll appreciate that 1/2" when you get closer to 50, believe you me.

    We've used birds blocks for spacing for the 25 plus years I've been setting trusses with no problems - might pull a measurement every once in a while just to make sure we're close to paralell, but only on real long runs, or if working with someone new.

    If there's three on the crew, I like to string the peak, but more often it's just two of us.  Hey, did they show the trick of hooking your hammer in the crux where the top and bottom chords meet and rotating it to bring the truss upright?  Hah!  That's a good one I learned as a young buck. 

    We always do as much sheathing and siding as possible to the gable trusses before errecting them, too. 

     

    1. Isamemon | Nov 28, 2004 12:08am | #19

      thanks

      see we were always told to hold the outside edge of bird blocks just inside of the sheeting therefore we lost plate space. old dog learning from an old dog and it became habit.  Our current house has enclosed soffits so we can put them anyplace we want.

      so do you mark the plates then if your using the blocks to set the distance ?

      we , also use a string between gables at ridge and line up that way, however on windy days and long runs, that does not help much

      you said when it is just two of you you dont string them, then how do you keep them straight ? we mark the truss and assume the wall has stayed straight, never tried Haunns way, interested in what others do.

      this is the first time I have sheeted the gables first before the crane put them up, boy was that a smart thing to finally try, see that happpenin from now on. another old dog taught habit.

      agai , thanks all for the answers and ideas

       

      Edited 11/27/2004 4:11 pm ET by Isamemon

      1. jimblodgett | Nov 28, 2004 02:12am | #24

        "so do you mark the plates then if your using the blocks to set the distance ?"

        Nope.  Start with a full block nailed to the first gable truss, then rotate the first common truss to vertical tight against it, nail the truss to the block and toenail to the plate twice, nail in the next block, rotate the next truss...and so on.

        "you said when it is just two of you you dont string them, then how do you keep them straight ? we mark the truss and assume the wall has stayed straight, never tried Haunns way, interested in what others do."

        We measure down from the peak, mark one edge of plate.  Once in a while I've even seen trusses uniform enough to use the corner of the bottom chord or to string the tails, but I'm never comfortable with either of those methods and spend more time double and triple checking for uniformity that I waste more time than if I had gone ahead and marked them all in the first place.

        "this is the first time I have sheeted the gables first before the crane put them up,"

        We try to have the walls ready when the trusses arrive, then the driver sets them directly on the walls, eliminating the need for a crane.  I admit it would be nice to have a crane around, that hasn't been my experience as a small time carpenter. 

        The gable trusses are either both on one side of the stack, or top and bottom.  Either way, once you spread trusses flat, it's easy enough to toenail the bottom chord of each gable truss 1+1/2" back from the edge of the plate, put a few deadmen under the top chord to keep it flat, and side the gable before rotating it to vertical. 

        Worked with a production framer for a year or so in the early 80s who liked to notch for and install outlookers and barge boards before rotating gable truss, but I never could see how that saved much time and it's a lot easier to notch for outlookers after the gable is rotated - to each their own. Of course, that was all in the days before pneumatic guns were common.   

      2. Diamond | Nov 29, 2004 04:10am | #33

        I lay out my top-plates while the wall is on the floor, plumb and line all the walls, set gables after they are sheeted. string ridge line and set all trusses to the line, install bird blocks, string eave line and trim any tails that are to long. I havn't seen a set of trusses that were all EXACTLY the same yet. Since the ridge is the only part that you can't adjust it makes sense to me to set everything to that point.

  7. Isamemon | Nov 28, 2004 09:27pm | #31

    Blodget had good construction advice, one of these days he'll be the Larry Haunn with articles in FHB every couple of months

  8. blue_eyed_devil | Nov 30, 2004 10:05am | #35

    Absolutely right Isamenmon. If you have precut blocks you can skip the layout.

    Of course the blocks have to be cut the proper length....which no one can figure out...except guys like me...err I mean Haun.

    Personally, I've never put a bird block in...we have all closed soffits and they're not necessary...but if they were, I'd know the exact length needed if it took me ten houses to learn it. It wouldn't though....I already know.

    The blocks should be 22 3/8". You have to allow for the plates, and the lumber which is usually slightly more than 1.5" despite most peoples opinions. The only lumber that is exactly 1.5" is kild dried and surfaced dry lumber which is usually only the studs. The plate stock and linial is surfaced green and is usually between 1.5" and 1 9/16".  If you keep adding up the 1/32" and the thickness of the plates...your bound to gain quite a bit.

    The easiest way to keep track of gain is to compare your trusses to the stud layout. Of course...if your stud layout is gaining too, this idea won't help you.

    blue

    Warning! Be cautious when taking any framing advice from me. Although I have a lifetime of framing experience, all of it is considered bottom of the barrel by Gabe. I am not to be counted amongst the worst of the worst. If you want real framing information...don't listen to me..just ask Gabe!

Log in or create an account to post a comment.

Sign up Log in

Become a member and get full access to FineHomebuilding.com

Video Shorts

Categories

  • Business
  • Code Questions
  • Construction Techniques
  • Energy, Heating & Insulation
  • General Discussion
  • Help/Work Wanted
  • Photo Gallery
  • Reader Classified
  • Tools for Home Building

Discussion Forum

Recent Posts and Replies

  • |
  • |
  • |
  • |
  • |
  • |
View More Create Post

Up Next

Video Shorts

Featured Story

Podcast Episode 688: Obstructed Ridge Vent, Buying Fixer-Uppers, and Flashing Ledgers

Listeners write in about removing masonry chimneys and ask about blocked ridge vents, deal-breakers with fixer-uppers, and flashing ledgers that are spaced from the wall.

Featured Video

Builder’s Advocate: An Interview With Viewrail

Learn more about affordable, modern floating stairs, from design to manufacturing to installation.

Related Stories

  • Guest Suite With a Garden House
  • Podcast Episode 688: Obstructed Ridge Vent, Buying Fixer-Uppers, and Flashing Ledgers
  • FHB Podcast Segment: Finding the Right Fixer-Upper
  • Keeping It Cottage-Sized

Highlights

Fine Homebuilding All Access
Fine Homebuilding Podcast
Tool Tech
Plus, get an extra 20% off with code GIFT20

"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Fine Homebuilding Magazine

  • Issue 332 - July 2025
    • Custom Built-ins With Job-Site Tools
    • Fight House Fires Through Design
    • Making the Move to Multifamily
  • Issue 331 - June 2025
    • A More Resilient Roof
    • Tool Test: You Need a Drywall Sander
    • Ducted vs. Ductless Heat Pumps
  • Issue 330 - April/May 2025
    • Deck Details for Durability
    • FAQs on HPWHs
    • 10 Tips for a Long-Lasting Paint Job
  • Issue 329 - Feb/Mar 2025
    • Smart Foundation for a Small Addition
    • A Kominka Comes West
    • Making Small Kitchens Work
  • Issue 328 - Dec/Jan 2024
    • How a Pro Replaces Columns
    • Passive House 3.0
    • Tool Test: Compact Line Lasers

Fine Home Building

Newsletter Sign-up

  • Fine Homebuilding

    Home building tips, offers, and expert advice in your inbox.

  • Green Building Advisor

    Building science and energy efficiency advice, plus special offers, in your inbox.

  • Old House Journal

    Repair, renovation, and restoration tips, plus special offers, in your inbox.

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters

Follow

  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X
  • Fine Homebuilding

    Dig into cutting-edge approaches and decades of proven solutions with total access to our experts and tradespeople.

    Start Free Trial Now
    • Facebook
    • Instagram
    • X
    • LinkedIn
  • GBA Prime

    Get instant access to the latest developments in green building, research, and reports from the field.

    Start Free Trial Now
    • Facebook
    • YouTube
  • Old House Journal

    Learn how to restore, repair, update, and decorate your home.

    Subscribe Now
    • Facebook
    • Instagram
    • X

Membership & Magazine

  • Online Archive
  • Start Free Trial
  • Magazine Subscription
  • Magazine Renewal
  • Gift a Subscription
  • Customer Support
  • Privacy Preferences
  • About
  • Contact
  • Advertise
  • Careers
  • Terms of Use
  • Site Map
  • Do not sell or share my information
  • Privacy Policy
  • Accessibility
  • California Privacy Rights

© 2025 Active Interest Media. All rights reserved.

Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.

  • Home Group
  • Antique Trader
  • Arts & Crafts Homes
  • Bank Note Reporter
  • Cabin Life
  • Cuisine at Home
  • Fine Gardening
  • Fine Woodworking
  • Green Building Advisor
  • Garden Gate
  • Horticulture
  • Keep Craft Alive
  • Log Home Living
  • Military Trader/Vehicles
  • Numismatic News
  • Numismaster
  • Old Cars Weekly
  • Old House Journal
  • Period Homes
  • Popular Woodworking
  • Script
  • ShopNotes
  • Sports Collectors Digest
  • Threads
  • Timber Home Living
  • Traditional Building
  • Woodsmith
  • World Coin News
  • Writer's Digest
Active Interest Media logo
X
X
This is a dialog window which overlays the main content of the page. The modal window is a 'site map' of the most critical areas of the site. Pressing the Escape (ESC) button will close the modal and bring you back to where you were on the page.

Main Menu

  • How-To
  • Design
  • Tools & Materials
  • Video
  • Blogs
  • Forum
  • Project Guides
  • Reader Projects
  • Magazine
  • Members
  • FHB House

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Podcasts

  • FHB Podcast
  • ProTalk

Webinars

  • Upcoming and On-Demand

Popular Topics

  • Kitchens
  • Business
  • Bedrooms
  • Roofs
  • Architecture and Design
  • Green Building
  • Decks
  • Framing
  • Safety
  • Remodeling
  • Bathrooms
  • Windows
  • Tilework
  • Ceilings
  • HVAC

Magazine

  • Current Issue
  • Past Issues
  • Magazine Index
  • Subscribe
  • Online Archive
  • Author Guidelines

All Access

  • Member Home
  • Start Free Trial
  • Gift Membership

Online Learning

  • Courses
  • Project Guides
  • Reader Projects
  • Podcast

More

  • FHB Ambassadors
  • FHB House
  • Customer Support

Account

  • Log In
  • Join

Newsletter

Get home building tips, offers, and expert advice in your inbox

Signing you up...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
See all newsletters
See all newsletters

Follow

  • X
  • YouTube
  • instagram
  • facebook
  • pinterest
  • Tiktok

Join All Access

Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.

Start Your Free Trial

Subscribe

FHB Magazine

Start your subscription today and save up to 70%

Subscribe

Enjoy unlimited access to Fine Homebuilding. Join Now

Already a member? Log in

We hope you’ve enjoyed your free articles. To keep reading, become a member today.

Get complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.

Start your FREE trial

Already a member? Log in

Privacy Policy Update

We use cookies, pixels, script and other tracking technologies to analyze and improve our service, to improve and personalize content, and for advertising to you. We also share information about your use of our site with third-party social media, advertising and analytics partners. You can view our Privacy Policy here and our Terms of Use here.

Cookies

Analytics

These cookies help us track site metrics to improve our sites and provide a better user experience.

Advertising/Social Media

These cookies are used to serve advertisements aligned with your interests.

Essential

These cookies are required to provide basic functions like page navigation and access to secure areas of the website.

Delete My Data

Delete all cookies and associated data