Has anyone poured an addition for a bath that contained a curbless shower? My research has found that I’m suppose to lower the area of the shower (step it down) 3″. and set my drain 1/2 inch lower than the opening to make the 1/8″ per foot.
Any suggestions?
Replies
Here's what I did / do. I dropped the slab 6" in the area of the shower on the original pour, left a box around the trap, then afterwards used Sakrete to build the slope in.
http://forums.taunton.com/tp-breaktime/messages?msg=70699.1
Forrest