Need to locate radient heat lines in poured basement floor. Floor settled and cracked, contractor wants to core drill floor to pump surry mix to level floor area. How do we miss the radient tude??? Thanks,
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Learn about balloon-framing construction techniques, including stud patterns and efficient assembly methods with minimal manpower and scaffolding.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
Crank the heat up, keep it circulating, wet mop the whole floor...the area over the tubes will dry first.
Thanks, simple will try.
A hand held infrared thermometer will help.
IR camera will also work. When you find the lines mark them for future projecs.I like the mop trick.Garett