when i’m installing a finished stair should i work up from the bottom installing riser then tread, riser then tread ect. .or sould i install all the treads first and squeeze the risers in second.thanks.
RTC
when i’m installing a finished stair should i work up from the bottom installing riser then tread, riser then tread ect. .or sould i install all the treads first and squeeze the risers in second.thanks.
RTC
Fine Homebuilding's editorial director has some fun news to share.
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Get home building tips, offers, and expert advice in your inbox
Fine Homebuilding
Get home building tips, offers, and expert advice in your inbox
© 2024 Active Interest Media. All rights reserved.
Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.
Get home building tips, offers, and expert advice in your inbox
Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.
Start Your Free TrialStart your subscription today and save up to 70%
SubscribeGet complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.
Already a member? Log in
Replies
I think most of us start at the bottom and place at least the first two risers. The treads sit on top of the preceding riser and butt against the next one. We often put screws through the bottom edge of the next riser into the edge of the tread. Some may place all the risers first. You won't be able to make the tread riser connection if you put treads first. It's also nice to be able to shim out the riser when needed to fit tight to the tread. And, yes, you often have to buy 10" wide risers and rip them down if they are more than 7 1/4".
Beat it to fit / Paint it to match
RTC, I hate changing gears, and always want to do all of one task before starting the next. So I set all the risers first, then go back to the bottom and set all the treads. For risers I like to rip down 3/4" birch plywood. Cheaper than poplar, and won't shrink on you.
Mike