To run shower head pipe from the shower valve through 4″ high concrete block exterior wall I had to break out a course about 8 feet horizontally. All the vermiculite insulation drained out of the cavities (about 4 trash bags). After the plumber installs the pipe what is the best way to reinsulate the drained cavities and the pipe before I plug up the hole with block sections and mortar? The shower wall will be tiled over in travertine or ceramic over the block. I have 10-15 3 foot block cavities to fill. I thought about an expanding foam (Great Stuff, or similar) but it would take a lot ( I estimate 6 cubic feet of cavity combined total.
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Listeners write in about haunted pipes and building-science tomes, and they ask questions about roof venting and roof leaks.
Featured Video
SawStop's Portable Tablesaw is Bigger and Better Than BeforeHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.