Just Can’t get it Right the First Time!
I am framing the roof on a room addition today. It will be hipped and Californiaed in to the existing roof.I dont do alot alot of these and always have trouble locating the exact line of the valley where I normally use a beveled 1 x 6 for the valley jacks to land.Havent gotten it right the first time yet! 132″ total run ,2x ridge ,4 in 12 . existing roof is 1 x 6 spaced w/ 1 / 2 ” osb on top . Do i need 1 x 6 ‘s @ the valley’s ? How can I snap the valley line right the first time? pls help.
Triggerski