When I’m doing sidewalks and driveways, I come in after the excavator has
done my digging, and I set up the forms. Sand or roadbase goes in if it’s
a driveway, and the excavator does the rough grading for that. As I’ve
only recently begun bidding this type of work for myself, I could use some
advise on estimating labor for setting the forms and doing the final
grading. Many thanks,
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
Skim-coating with joint compound covers texture, renews old drywall and plaster, and leaves smooth surfaces ready to paint.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
When I'm doing sidewalks and driveways, I come in after the excavator has
done my digging, and I set up the forms. Sand or roadbase goes in if it's
a driveway, and the excavator does the rough grading for that. As I've
only recently begun bidding this type of work for myself, I could use some
advise on estimating labor for setting the forms and doing the final
grading. Many thanks,