When I’m doing sidewalks and driveways, I come in after the excavator has
done my digging, and I set up the forms. Sand or roadbase goes in if it’s
a driveway, and the excavator does the rough grading for that. As I’ve
only recently begun bidding this type of work for myself, I could use some
advise on estimating labor for setting the forms and doing the final
grading. Many thanks,
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
The "She Build" initiative is empowering women in Seattle, WA by ensuring they have safe, healthy homes.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
When I'm doing sidewalks and driveways, I come in after the excavator has
done my digging, and I set up the forms. Sand or roadbase goes in if it's
a driveway, and the excavator does the rough grading for that. As I've
only recently begun bidding this type of work for myself, I could use some
advise on estimating labor for setting the forms and doing the final
grading. Many thanks,