getting ready to do a slab with radiant pek tube , what reinforcing would go good with
the tube 3’8 rebar or 6 by mesh plastic clips or tie wire?
getting ready to do a slab with radiant pek tube , what reinforcing would go good with
the tube 3’8 rebar or 6 by mesh plastic clips or tie wire?
Fine Homebuilding's editorial director has some fun news to share.
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Get home building tips, offers, and expert advice in your inbox
Fine Homebuilding
Get home building tips, offers, and expert advice in your inbox
© 2024 Active Interest Media. All rights reserved.
Fine Homebuilding receives a commission for items purchased through links on this site, including Amazon Associates and other affiliate advertising programs.
Get home building tips, offers, and expert advice in your inbox
Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.
Start Your Free TrialStart your subscription today and save up to 70%
SubscribeGet complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.
Already a member? Log in
Replies
Greetings b,
This post, in response to your question, will bump the thread through the 'recent discussion' listing again.
Perhaps it will catch someones attention that can help you with advice.
Cheers
'Nemo me impune lacesset'
No one will provoke me with impunity
getting ready to do a slab with radiant pek tube , what reinforcing would go good with
the tube 3'8 rebar or 6 by mesh plastic clips or tie wire?
(Thanks to Razz for popping this one abck "up" again.)
"We" are likely going to need a tad bit more info to answer your question.
Like, is this a structual floor slab, or one over some other floor? What has the HVAC designer (of the RFH system) recommended? Does your local AHJ (Authority Having Jurisdiction--the Building Dept., or such similar) require any minimums?
The little things make a difference. Sure, #3 (3/8" nominal diameter) bar at 12" O.C.E.W. will suffice for many floor slabs (or driveways, or what not). That might not meet a California seismic code, though. "The devil is in the details" is particularly true of concrete detailing. How one ties the slab concrete to beams, footings, etc. become a force defining the reinforment, too.
(Sadly, we are not allowed to edit Thread titles once posted, otherwise we could have you change "pek" to "pex," the more common name for the tubing used in radiant heat.)
Thank rez for giving your pex a peck to the top!
For non structural slabs here we use 6" wire mesh. It forms a good grid to hold the pex in place. Most heating engineers spec the pex to run at 18" oc for greatest efficiency and least heat damage to the crete. The same engineers spec the size of the pex and how long each run should be. You have those specs, right?
Welcome to the
Taunton University of Knowledge FHB Campus at Breaktime.
where ...
Excellence is its own reward!
6" wire mesh and plastic ties to secure them in place is what was used in my basement.