I went and visited a house the other day and it had a balcony the was about 8′ wide and 20′ long. The balcony had a tile floor.
I know that the framers used PT joist with a 3/4″ Osb sub-floor.
I don’t know what happened after that.
How do yoiu suppose that they finished this?
Replies
berrrry, berrrry, carefuwlwy.
Spheramid Enterprises Architectural Woodworks
Repairs, Remodeling, Restorations.
I've installed copper flat seam roofs under similar details. One that I did had a built in gutter with drains running thru the supporting columns. I've also flashed with copper so a pourable membrane could be installed under the tile. I did the flashing first and then the membrane was poured. I only saw before and after and did not witness the membrane being installed. Maybe Boris Yeltsin will spot this thread and enlighten us.