FHB Logo Facebook LinkedIn Email Pinterest Twitter Instagram Plus Icon Close Icon Navigation Search Icon Arrow Down Icon Video Guide Icon Article Guide Icon Modal Close Icon Guide Search Icon Skip to content
Main Menu
Subscribe

In every issue you'll find...

  • Expert insights on techniques and principles
  • Unbiased tool reviews
  • Step-by-step details to master the job
  • Field-tested advice and know-how
Subscribe Now!
Subscribe
  • How-To
  • Design
  • Tools & Materials
  • Videos
  • Blogs
  • Forum
  • Magazine
  • Members
  • FHB House
  • Podcast
  • Join
  • Log In
Main Menu Subscribe
Building Business

Checking Your Construction Estimate

Having a fast, accurate way of checking your prospect's budget will save you time and money in the long run.

By Shawn Van Dyke
Article Image

You’ve been there before. You’re discussing the budget of a potential project with a prospect, and you get that uneasy feeling in your gut that the prospect’s budget might not be enough for the project, but you’re a little unsure. You don’t want to miss out on closing the deal, but you also don’t want to lose money by making a commitment at such a preliminary stage of the sales process.

This is where having a fast, accurate way of checking your prospective customer’s budget will save you time and money in the long run.

Instead of pricing the work by calculating the cost of the materials, labor, subcontractors, and equipment, you should reverse- engineer the prospect’s budget for the time it takes to do the project.

Remember, you are not pricing the project at this stage of the sales process—you are simply verifying the budget. You will calculate the price of the project once you have determined the scope of work and all the details associated with it. But first you have to determine if the estimated budget is enough to cover the costs and provide you with the margin your business needs to make a profit.

Reverse-engineer the numbers

Let’s start with the margin, work our way back to the costs, and check the construction estimate. The example below comes from a conversation I had with one of my coaching clients.

The contractor asked the prospect for the budget of a potential kitchen remodel project. The prospect told the contractor her budget was $40,000 for this kitchen project and that she would provide the appliances, fixtures, and tile materials. The contractor’s initial gut reaction was that this budget was too small, but he wasn’t sure how to communicate what the budget should be. I told the contractor, “Let’s determine what we do know, and check this budget to see if it will work.”

We started with the following formula:

PRICE = COSTS × MARKUP FACTOR (see Pricing method #1 for more about this formula)

We know the budget, or price, is $40,000. And we know the markup factor for this construction business is 1.30, or a markup of 30%. (We previously determined the markup for this business by analyzing its profit and loss statements and developing a pricing strategy.)

Step 1: Start with what you know

We can now write the formula above like this:

$40,000 = COSTS × 1.3

Step 2: Solve for COSTS

If you remember the rules from algebra class, then we can solve for COSTS by writ- ing the formula like this:

COSTS = $40,000 ÷ 1.3

Now we can determine COSTS.

COSTS = $30,769.23

The difference between the price of $40,000 and $30,769.23 is your GROSS PROFIT. This means that if your costs for this project equal $30,769.23 and you sell these COSTS for $40,000, you will have this gross profit:

GROSS PROFIT = PRICE − COSTS = $40,000 − $30,769.23 = $9,230.77

And your margin is:

MARGIN = GROSS PROFIT ÷ PRICe × 100 = $9,230.77 ÷ $40,000 x 100 = 23%

When you start with your price and divide by your markup factor, you are essentially taking your profit first and determining if the remaining budget is enough to buy the COSTS of the project. (This method of reverse engineering your business is the subject of my book, Profit First

for Contractors.)

Step 3: Estimate COSTS of Materials and Subs

Now that we know the budget for the COSTS, we can start to subtract the estimated costs of the subcontractors and materials.

At this point in the process, you do not need to calculate the cost of the subcontractors and materials—you just need to estimate them. Remember, this is not a quote. This is an estimate. An estimate is a guess based on your experience. That’s it.

Here’s a table showing the estimated costs the contractor came up with based on his experience and an initial conversation with the prospect:

Step 4: Estimate the labor

I asked the contractor, “How long will it take to complete the project?”

He said, “Probably about four weeks over- all for a couple of guys.”

I replied, “So would you estimate it would take two guys two weeks if they could work straight through?”

He answered, “Yeah, that sounds about right. It’s two weeks of work for two guys over about four weeks time.”

I said, “Great. That’s 160 man hours— two guys working 40 hours per week for two weeks.”

Now we can estimate the labor costs for this project.

The wage for this level of production work is $35 per hour for this business.

Labor costs = $35 per hour × 160-man hours = $5,600

Step 5: Determine the estimated budget price
In this example, the total estimated costs without labor of $32,450 exceeds the bud- get costs of $30,769.23. Therefore, we know that the $40,000 budget is not realistic.

If the total estimated costs without labor were less than the budget costs, then you would divide the total estimated costs with- out labor by the hourly wage to determine the number of man hours available to do the work.

This is not the case for this project. We need to determine the correct budget based on what we know.

We estimated the labor cost at $5,600. We know the estimated cost without labor is $32,450. We also know that because this customer is already trying to “save money” by buying some materials and fixtures, this will cause additional delays and coordina- tion. The contractor decided to add a 10% difficulty factor to the estimated costs of the job to account for this. Therefore, the total estimated costs are:

TOTAL ESTIMATED COSTS = ($5,600 + $32,450) × 1.1 difficulty factor = $41,855

This is the cost of the project. This is not the price. We need to add the markup for this project.

The budget price for this project is:

PRICE = $41,855 × 1.3 = $54,500

Remember, this does not include the appliances, fixtures, and tile. This budget is only for the items listed above, and much of that was just a guess. There will be more when the contractor digs into the details.

Getting real with your customers

Based on this information, which took about five minutes to produce, the contrac- tor now knows what to tell the prospect. The $40,000 budget is not enough for the work she wants done. The budget for this project should be about $55,000, and she should probably plan on spending about $70,000 once the appliances, fixtures, and tile are included.

The prospect’s budget does not fit the estimate. This contractor will either sell the prospect on the appropriate budget, or walk away. There is no need to waste any more time running numbers. He knows everything he needs to know.

Calculate profitability

You cannot guess your way to profitability. You must calculate it. Once you have established a budget with your potential customer, then you need to ensure that your estimate is accurate for the preliminary scope of work.

Reverse-engineering your costs from the budget is a fast, accurate way to determine what your estimate should be. Once you have checked your construction estimate with realistic numbers and determined that the prospect has the budget, then you can move forward with developing the scope of work and preparing a proposal.

But preparing a proposal for a project is work, and professionals get paid to do work. Charge your prospects for a proposal. That’s when they become customers—when they actually buy something from you.

 


Follow me on YouTube, Instagram @shawnvandyke, LinkedIn, Facebook, or shawnvandyke.com to learn more about how to streamline your construction business.  My new book, Profit First for Contractors, will be released later this year. Follow the @ProfitFirstContractor account on Instagram for more information about the release of the book.

Sign up for eletters today and get the latest how-to from Fine Homebuilding, plus special offers.

Sign Up

Get home building tips, offers, and expert advice in your inbox

×
X
X

New Feature

Fine Homebuilding Forums

Ask questions, offer advice, and share your work

View Comments

  1. mzlehman | Mar 04, 2020 06:37pm | #1

    Amen. Very good way to save yourself the hassle of chasing a job that will go nowhere.

Log in or create an account to post a comment.

Sign up Log in

Become a member and get full access to FineHomebuilding.com

More Building Business

View All
  • Marketing in Place

  • Check Construction Estimate Profit First for Contractors

    Checking Your Construction Estimate

  • Top 4 Things We Learned in 2018

  • 7 Benefits of Paid Online Ads

View All

Up Next

Featured Story

Fine Homebuilding Issue 297

Fine Homebuilding – February/March 2021, Issue #297

Featuring: Battery-Powered Cordless Framing Nailers; Successful Floors With Trusses; Sidewall Shingles With a Flare; and High-Performance Raft Slab

Featured Video

Install Cable Rail Around Wood-Post Corners

How to Install Cable Rail Around Wood-Post Corners

Use these tips to keep cables tight and straight for a professional-looking deck-railing job.

Related Stories

  • Benefits of Building With ICFs

  • Installing a Motion-Sensor Light

  • Installing Low-Voltage Path Lights

  • How To Add Lighting To a Deck

Discussion Forum

Recent Posts and Replies

  • |
  • |
  • |
  • |
  • |
  • |
View More Create Post

Highlights

  • Fine Homebuilding All Access
  • Fine Homebuilding Podcast
  • Tool Tech

    Plus, get an extra 20% off with code GIFT20

  • "I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.

    Get home building tips, offers, and expert advice in your inbox

    Sign Up See all newsletters

Video

View All
  • Fine Homebuilding Podcast 329: PRO TALK With Jason Webster

    Podcast 329: PRO TALK With Modular-Home Builder Jason Webster

  • Podcast Episode 170: Is There Really a Skilled-Trade Gap?

  • Podcast Episode 163: Live from the Builder's Show: Home Depot’s Pro Services and Advancements in Cordless Tools

  • Why I Build: Brent Kelosky, Wood-Flooring Specialist

View All

Business

View All
  • First Day at the Virtual IBSx: Stuff You Won't Want To Miss

  • 2021 International Builders Show online experience

    Attending in Sweatpants: The Virtual 2021 International Builders' Show

  • Josh Salinger, Construction Business Owner

    Keep Craft Alive: Josh Salinger, Construction Business Owner

  • Mike Guertin presenting at conference.

    Building a Knowledge of Building

View All

BOOKS, DVDs, & MERCH

Shop the Store
  • Code Check Building 4th Edition

    Buy Now
  • 2020 Fine Homebuilding Archive

    Buy Now
  • Fine Homebuilding Magazine Slipcase

    Buy Now
  • Musings of an Energy Nerd

    Buy Now
  • Shop the Store

Fine Homebuilding Magazine

  • Issue 297 - Feb/Mar 2021

    • Foundations for Success
    • Staircase Renovation
    • Ditch the Hose
  • Issue 296 - Dec 2020/Jan 2021

    • Insulating Glass Keeps Getting Better
    • Simple Way to Make Old Walls Straight and Plumb
    • Making Sense of Minisplits
  • Issue 295 - Kitchens & Baths

    • Condo Kitchen Reimagined
    • Row-House Remodel
    • Rise of the IAQ Monitor
  • Issue 294 - Oct/Nov 2020

    • Schoolhouse Reimagined
    • Tool Test: Folding Sawhorses
    • A Better Way to Build Tall Walls
  • Issue 293 - Aug/Sept 2020

    • A Practical Guide to Fall Protection
    • Installing Frameless Cabinets
    • Make Any Tablesaw Safer

Fine Homebuilding

Follow

Newsletter

Get home building tips, offers, and expert advice in your inbox

Sign Up See all newsletters

Membership & Magazine

  • Online Archive
  • Start Free Trial
  • Magazine Subscription
  • Magazine Renewal
  • Gift a Subscription
  • Customer Support
  • Manage Preferences

Taunton Network

  • Green Building Advisor
  • Fine Woodworking
  • Fine Gardening
  • Threads
  • About
  • Contact
  • Advertise
  • Privacy Policy
  • Careers
  • Copyright
  • Terms of Use
  • Accessibility
  • CA Privacy Rights

© 2021 The Taunton Press, Inc. All rights reserved.

    Main Menu

  • How-To
  • Design
  • Tools & Materials
  • Video
  • Blogs
  • Forum
  • Reader Projects
  • Magazine
  • Members
  • FHB House
  • Podcasts

  • FHB Podcast
  • ProTalk
  • Account

  • Log In
  • Join

    Podcasts

  • FHB Podcast
  • ProTalk
  • Popular Topics

  • Kitchens
  • Business
  • Bedrooms
  • Roofs
  • Architecture and Design
  • Green Building
  • Decks
  • Framing
  • Safety
  • Remodeling
  • Bathrooms
  • Windows
  • Tilework
  • Ceilings
  • HVAC

    Magazine

  • Current Issue
  • Past Issues
  • Magazine Index
  • Subscribe
  • Online Archive
  • Author Guidelines

    All Access

  • Member Home
  • Start Free Trial
  • Gift Membership

    Shop the Store

  • Books
  • DVDs
  • Taunton Workshops

    More

  • FHB Ambassadors
  • Reader Projects
  • Podcast
  • Customer Support

    Account

  • Log In
  • Join

Newsletter

Get home building tips, offers, and expert advice in your inbox

Sign Up See all newsletters

Follow

Join All Access

Become a member and get instant access to thousands of videos, how-tos, tool reviews, and design features.

Start Your Free Trial

Subscribe

FHB Magazine

Start your subscription today and save up to 52%

Subscribe

We hope you’ve enjoyed your free articles. To keep reading, become a member today.

Get complete site access to expert advice, how-to videos, Code Check, and more, plus the print magazine.

Start your FREE trial

Already a member? Log in