previous
  • Projects Done Right
    Projects Done Right
  • Remodeling Articles and Videos
    Remodeling Articles and Videos
  • Custom Flooring Inspiration
    Custom Flooring Inspiration
  • Energy-Smart Details
    Energy-Smart Details
  • Read FHB on Your iPad
    Read FHB on Your iPad
  • Tips & Techniques for Painting
    Tips & Techniques for Painting
  • Video Series: Tile a Bathroom
    Video Series: Tile a Bathroom
  • 9 Concrete Countertops Ideas
    9 Concrete Countertops Ideas
  • 7 Trim Carpentry Secrets
    7 Trim Carpentry Secrets
  • 12 Remodeling Secrets
    12 Remodeling Secrets
  • Basement Remodeling Tips
    Basement Remodeling Tips
  • Magazine Departments
    Magazine Departments
  • All about Roofing
    All about Roofing
  • 7 Small Bathroom Layouts
    7 Small Bathroom Layouts
  • 7 Smart Kitchen Solutions
    7 Smart Kitchen Solutions
  • Pro Tool Rental
    Pro Tool Rental
  • Clever daily tip in your inbox
    Clever daily tip in your inbox
  • Master Carpenter Videos
    Master Carpenter Videos
  • Video: Install a Fence
    Video: Install a Fence
  • Design Inspiration
    Design Inspiration
next

Do precut studs make sense?

Q: Why is the length of a precut stud 92-5/8 in.? With the sole plate and two top plates at 1-1/2 in. each, the total wall height is 97-1/8 in. So with 1/2-in. drywall on the ceiling, a 7/8-in. gap is left, which is too much in my book. If you add 1x3 strapping to the ceiling, as they do on the East Coast, you’re left with 1/8 in., which is too tight. What is the logic of this standard?





A: Mike Guertin, co-author of Precision Framing, replies: The answer is that 92-5/8-in. studs leave about a 1/2-in. to 7/8-in. gap depending on the thickness of the plate stock, and that’s a good thing. I have two takes on it.

When I hang drywall, I want wiggle room. The ceiling can dip (especially under roof trusses on a wide building), or the floor can have a hump. The last thing I want is to have to trim 1/4 in. off a sheet of drywall. The extra 1/2-in. to 7/8-in. gap avoids this problem. After attaching drywall to the ceiling, lift the wall sheets up to the ceiling sheet, and leave the gap at the bottom plate. The bottom edge of the drywall should still be in contact with the plate.

This gap gives me an expansion perimeter when I’m installing hardwood flooring. And if I install 1/2-in. underlayment before framing interior walls, the extra space comes in handy. Once the baseboard is installed, the gap is covered.

I just thank the mills for making precuts at all. They save me a lot of time (and wasted material) for no extra charge. And if you strap your ceilings with 1x3, just sandwich some 1/2-in. plywood or oriented strand board scraps between the two top plates to avoid having to trim the drywall. I’ve been using precut studs successfully for years. I just can’t wait for them to start cutting 94-1/8-in. studs that I can use for optimumvalue-engineered single-plate wall framing.


From Fine Homebuilding 149, pp. 20 September 1, 2002